PROFILE § Bachelor’s
Degree in Industrial Engineering, with 12 years of experience in Planning and
Project Controls and also Cost Control functions in medium size to major Oil,
Gas and Petrochemical projects. MAJOR
QULIFICATIONS -
Considerable knowledgeable in Project Control functions (Planning,
Scheduling and Cost Control) -
Proficient in Primavera P6,SAP, MS Excel, MS
Project and in-house Project Control developed packages -
Deep understanding of Engineering, Procurement,
Construction and Commissioning phases of projects -
Familiar with project management functions, such
as Contract Administration, Legal, Accounting, etc. -
Proven communication skills throughout project
lifecycle and to a wide range of audiences -
Self-starter, highly organized, and
detailed-oriented with a strong motivation to continue learning -
Highly analytical, ethical, and team-oriented §
WORK
EXPERIENCE July
2014 - Present: Planner/Scheduler at Marathon Oil Corporation. (Link) Project: South Texas, Eagle Ford Shale, Kenedy -
Prepared project Work Breakdown Structure and EPC
time schedule using Primavera P6, for all areas in the Eagle Ford Shale that
required drilling, completion, construction and handover activities. -
Created periodical status reports Including
Daily, Weekly and Monthly Reports. -
Prepared and maintained several data bases such
as, Punch List Tracking, Down Time Tracking, PSSR Status, Thermal Tracking,
Shut in and Turn on Wells Data base, Overtime Tracking, etc. -
Interface scheduling and Issuance of practical
recommendations for optimizing current sequences between activities within
Drilling, Completion, Construction and Work over tasks by focusing on
Increasing of productivity and efficiency and reducing cost. -
Created forecasting Capital Planning Cycle for
Operations Department and issuance of comparison graphs and analyzing the
deviation reasons. -
Issued Optimum Resource allocation plans (Using
P6 resource assignment) for all operation routes in the Kenedy Area by
focusing on minimizing overtime and increasing efficiency. -
Set and presented analytical reports in meetings
that range in technical granularity and audience Feb
2007-Jan 2014: Planning and Project Control Manager at IOIC
Consortium- (IPMI Co), (Link) Project: EPC-South Pars Gas Field
Development-Phase 17&18 - Budget $5.5 Billion - Received Time Schedules from various Sub-Contractors and Suppliers and
incorporated and maintained Integrated Time Schedule using Primavera P6,
including 7000 activities. -
Efficiently integrated and optimized project
resources and control of all planned and actual manpower and machinery at
onshore construction site. -
Performed continuous maintenance of EPCC detailed
time schedule by holding schedule review meetings, identifying and reporting
variations (with Baseline), coordinating preparation of re-baseline, and
incorporating changes in original Scope of Work. -
Assisted Change Management committee in
performing change analysis and influences on time and cost. -
Prepared various weekly and monthly reports,
Analyzing all variances related to Planned, Forecasted and Actual progress
curves using P6 and Excel, Presented all variances and issuance of corrective
solutions for saving time and minimizing cost deviations . -
Worked closely with other project control
functions (specially Cost and Risk) to complete forecasting and ensure the
complete project control services to Project Manager. -
Identified multiple project critical paths on a
weekly basis to ensure that our PMT met specified targets Jan
2005 – Jan 2007: Planner/ Scheduler, Project Controls Engineer at NBB
Group, (Link) Project: EPC- Ilam Petrochemical Complex - Budget $1.7 Billion -
Applied WBS and produced detailed lists of
activities using contract, execution plan and drawings, entered all the
activities into Primavera P6, set-up logical relationship between the
activities to prepare Level 4 time schedule (Control level) with 2000
activities, and identified multiple critical paths. - Performed variance analysis for actual project performance, schedule
and resource baseline. -
Coordinated schedules from multiple contractors
and incorporated them into the overall master schedule. -
Maintained detail time schedule (updated actual
progress and actual resources), reviewed project critical paths, and warned
all deviations and delays in project critical path (CPM). - Assisted cost engineering team for preparation of cost breakdown structure,
budget and cost baseline, calculation of actual and forecasted costs trends;
Issuance of Earned value and cost/schedule performance indexes (SPI and CPI). -
Led regular team meetings and presented achieved
progress vs. forecasted values and labor and non-labor resource status -
Provided efficient day-to-day service to our PMT
by reporting on plans, costs and project performance May
2003 – Nov 2004: Construction Scheduler at Ghadeer
Petrochemical Co., (Link) Project: EPC-VCM/PVC Production Plant - Budget
$900 Million - preparation of detailed construction plans/schedules for different
process units of projects / Prepared detailed time schedule for construction
activities and definition of completion work stages - Reviewed contractor’s time schedules and prepared comparison report
with the master time schedule and monitor the project finish date (EACt). - Monitored and forecasted progress of activities in contractors work
schedules - Evaluated project critical paths in the project schedules, proposed
alternative schedule options to optimize project execution plan and avoid
delay on critical path. -
Prepared and updated progress and resources
(actual & planned), led meetings with contractors and follow up the
scheduled activities, variances, hold points and resources. - Provided timely feedback to the project managers for activities
trending away from the baseline. Sep
2002 – May 2003: System
Analyzing Engineer at Water & Effluent Treatment org. - Established Management Information System (MIS) and Preventive
maintenance system (PM) - Issuance of optimum MIS and PM systems and conducting operational
teams to established systems. §
SOFTWARE
SKILLS - Primavera (P3, P6), MS.
Project, SAP , Pert Master - Microsoft Excel and PowerPoint, Visio, Spot fire §
Academic
Qualification
- Bachelor of Science | Industrial
Engineering, Azad University, 1997 - 2001 §
Professional
Certificates -
“Earned Value Management” Aryana Group, PMI PMP certified teacher (Certificate), May 2008 -
“Pert Master” Aryana Group (Certificate), September 2010 -
“FMEA” RW TUV Institute (Certificate), February 2005 -
“Primavera Enterprise ” Tehran Tadbir Tarh Institute (Certificate), Aug-2005 -
“ISO 9000 Documentation and
Auditing” RW TUV and MIC Institutes (Certificates),
December 2000 -
“PMBOK” Course by PMI PMP certified teacher (Certificate), June 2007 Page: